JEF Company logo

EARTHING SYSTEM

Earthing Studies Logo

Introduction

JEF Earthing System ensures the healthiness of complete Earthing system. It is important that the earthing system is inspected periodically to ensure the health and effectiveness. Since the majority of Earthing System is buried underground/inaccessible, it suffers from “OUT OF SIGHT IS OUT OF MIND” syndrome. Unseen Components like Equipment Earth Conductor (Strip), Earth Grids / Mats which are buried or inaccessible, tend to be taken for granted or ignored, though they are crucial. As per CEA regulation 41 (xv) b, resistance of earthing system shall be maintained as low as possible such that sufficiently large fault current flows in the circuit and the breaker trips ON TIME to isolate the faulty circuit.

A Complete Earthing System with all its components- Equipment Earth Conductor, Earth Electrode, and Earth Grid / Mat should offer low resistance path for fault current to flow so that breakers trip on time to prevent accidents such as -Fire, Short Circuit, and Electric Shock and so on.

Get in touch for Real-Life Case Studies and Testimonials

CONTACT USAd33562234Bc92238F0281Eafa23A9B3C49A837F5Ae8D3662C67Bc1D8B919E14?Placeholderifabsent=True&Apikey=7904Fd7Afaaf4Ee2B0837Ab86D91B244
  • ABOUT Earthing system
  • Common issues with grounding systems
  • Common problems due to Improper Grounding
  • Resistance Measurement
  • Benefits of Doing Grounding Audit
  • Deliverables from Grounding Audit
  • EARTHING SYSTEM AUDITS – EHV
  • EARTHING SYSTEM AUDITS – LV
  • Value Adds by JEF
  • Application Area / Reference Standards
Why Earthing Audit?

Why Earthing Audit?

•

Earthing Audit is needed because earthing deteriorates over time due to various reasons such as Chemical Properties of Soil leading to Environmental Corrosion, Thermal & Electrical Stress on joints due to Electrical Faults, Galvanic Corrosion in some cases and Improper Workmanship.

•

Normally Earth Electrode (Pit) Resistance alone is measured periodically. Electrical System is deemed to be safe with a low Earth Electrode Resistance.

•

The Integrity of Earth Conductor (Strip) between Earth Electrode and Equipment is rarely checked. Hence Breaker may not trip even if Earth Electrode Resistance is low.

•

In reality, timely operation of the breaker (Electrical Safety) depends on the resistance of earth loop formed by equipment earth conductor (Strip), earth electrode and phase conductor.

•

System modifications and Deterioration of Earthing System can render the original design calculations of protection system (breakers) invalid.

Common issues with grounding systems

Common issues with grounding systems

•

Majority of faults in the system are phase to ground.

•

Majority of earthing system is below the ground.

Common problems due to Improper Grounding

Common problems due to Improper Grounding

•

Failure of Electronic Cards & Equipment

•

Failure of ELV assets

•

Maloperation of Ground Fault Protection

•

System Derating due to Power Quality Issues

•

Neutral Voltage shift due to rise in Neutral to Ground Voltages

•

Noise Interferences Resulting in Nuisance Tripping

•

Risk to human life

Resistance Measurement

Resistance Measurement

Grounding Audit is not just the measurement of resistance.

•

Resistance measurement may not give holistic view of the condition of earthing system.

•

Ground grid has multiple parallel paths, few open risers/ground connections/ grid disconnections will not impact the overall resistance.JEF’s assessment methodology covers this crucial gap by checking all the above parameters, thereby ensuring timely operation of the breakers to prevent accidents/damage.Carried out on live systems without Shutdown using sophisticated meters and practices. By emphasizing and encouraging the use of right personal protection equipment.

Benefits of Doing Grounding Audit

Benefits of Doing Grounding Audit

•

Reduction in equipment failures by about 38-40%.

•

Enhanced reliability of equipment

•

Reduces nuisance tripping

•

Improves human safety

Deliverables from Grounding Audit

Deliverables from Grounding Audit

•

Pinpoint open and defective risers. Corrective action - excavate that specific point and rectify

•

Identify specific areas of Grid Islanding (Intra Grid). Corrective action - provide alternate connections

•

Identify grids which are not connected (Inter Grid). Corrective action - provide alternate connections

EARTHING SYSTEM AUDITS – EHV

EARTHING SYSTEM AUDITS – EHV

ACTVITY

•

Soil Resistivity Test

•

Earth Electrode Resistance Test

•

Riser Integrity Test

•

Grid Integrity Test

•

Effect of Corrosion

•

Touch and Step Potential Test

•

Modeling and Simulation of earth grids for safe touch & step potentials.

EARTHING SYSTEM AUDITS – LV

EARTHING SYSTEM AUDITS – LV

ACTVITY

•

Soil Resistivity Test

•

Earth Electrode Resistance Test

•

Earth Loop Impedance Test

•

Prospective Fault Current Test

•

Riser Integrity Test

•

Effect of Corrosion

Value Adds by JEF

Value Adds by JEF

•

Cost effective solution to overcome the hazards and mitigate risks.

•

Pin point open or weak joints in a buried earthing grid which can severely impact safety and cause unexplained failure of equipment.

•

Identifies locations with unsafe touch & step potentials in the substation.

•

Ensures timely tripping of breakers in case of a fault, thus preventing short circuit, fire, shocks and so on.

•

Ensures Human and Equipment Safety.

•

Site Survey and measurements from qualified and experienced Engineers.

Application Area / Reference Standards

Application Area / Reference Standards

•

AIS & GIS Substations, Commercial Buildings, Retails outlets, Warehouses, Data Centers, Factories, Manufacturing plants, Oil & Gas, Metro rail, Process plants, Wind & Solar Plants, Tank farms, Critical structures like communication towers, power plants and more.

•

IEEE 81-2012

•

IEE Regulation

•

CEA regulations for measures relating to safety and electric supply - 2021 (Draft)

•

IEEE 80 – 2013

•

IS 3043

•

BS 7430

•

CBIP manual-339

Earthing/Grounding System Illustration

Value Adds by JEF

Cost effective solution to overcome the hazards and mitigate risks.
Pin point open or weak joints in a buried earthing grid which can severely impact safety and cause unexplained failure of equipment.
Identifies locations with unsafe touch & step potentials in the substation.
Ensures timely tripping of breakers in case of a fault, thus preventing short circuit, fire, shocks and so on.
Ensures Human and Equipment Safety.
Site Survey and measurements from qualified and experienced Engineers.
Recommendations by experts based on detailed site survey.
Recommendations ensure compliance with latest Indian and International Standards.
Detailed report with measured data, anomalies & defects observations, recommendations for rectification along with site photographs.
Background for testimonials section

TESTIMONIALS

WHAT OUR CUSTOMERS SAY

We are thankful to the JEF Techno's team for clearing many of our doubts related to lightning protection. LPS audit was conducted for our plant that happened successfully.JEF supported us in providing very innovative and practical solutions to earthing and lightning protection systems. Every input from the team was with proper technical justification and in line with national & international standards.We have been associated with JEF Techno for the last 5 years. Product Quality and After Sales Service provided by them is up to the mark.We have taken JEF’s technical expertise for Lightning Protection System for our Bangalore Warehouse. While working with them, we got to know that lightning protection is just not some product, it’s a complete solution.